File #: 22-1150   
Type: Consent Status: Agenda Ready
File created: 1/10/2022 In control: City Council
On agenda: 2/3/2022 Final action: 2/3/2022
Title: Authorize award and execution of a construction contract with Restek, Inc., for the 2021-2025 Bridge Maintenance Indefinite Delivery/Indefinite Quantity Rebid contract in the amount of $850,000 for an initial one-year term, with four, one-year extension options of $850,000 each for a total contract amount not to exceed $4,250,000. [Note: This contract will be awarded in compliance with City Code Chapter 2-9A (Minority Owned and Women Owned Business Enterprise Procurement Program) by meeting the goals with 6.58% MBE and 1.67% WBE participation.]
Attachments: 1. MWBE, 2. Recommendation for Action
Date Action ByActionAction DetailsMeeting Details
No records to display.

Posting Language
Title

Authorize award and execution of a construction contract with Restek, Inc., for the 2021-2025 Bridge Maintenance Indefinite Delivery/Indefinite Quantity Rebid contract in the amount of $850,000 for an initial one-year term, with four, one-year extension options of $850,000 each for a total contract amount not to exceed $4,250,000.

 

[Note: This contract will be awarded in compliance with City Code Chapter 2-9A (Minority Owned and Women Owned Business Enterprise Procurement Program) by meeting the goals with 6.58% MBE and 1.67% WBE participation.]

 

Body

Lead Department

Financial Services Department.

 

Managing Department
Public Works Department.

 

Fiscal Note

Funding for the initial amount of $850,000 is available in the Fiscal Year 2021-2022 Operating Budget of the Public Works Department. Funding for the extension options is contingent upon available funding in future budgets.

 

Purchasing Language:

Lowest responsive bid of two bids received through a competitive Invitation for Bids solicitation.

 

 

 

For More Information:

Respondents to this solicitation, and their representatives, shall direct inquiries to Rolando Fernandez, 512-974-7749, Garrett Cox, 512-974-9423, or the Project Manager Jose Ibarra, 512-974-7195.

 

 

 

Additional Backup Information:

The Public Works Department Bridge Maintenance program was created in 2003 with the intent to expeditiously rehabilitate structures that are at risk of failing, have been damaged by traffic collisions, flooding, fire, and aging. In the past, the City has managed bridge repairs on an as-needed basis. This method had no systematic ability to forecast future rehabilitation, replacement needs, or schedule preventive maintenance, which could extend the useful life span of these structures. The program mission is to “improve organized knowledge of the condition of our bridge system which can be used to prioritize or optimize a plan for bridges needing preventive or repair maintenance, rehabilitation, or replacement in order to keep the City of Austin’s bridges in a good serviceable condition for the traveling public”.

 

Indefinite Delivery/Indefinite Quantity contracts provide for an indefinite quantity of services for a fixed time, usually an initial term with extension options. They are commonly used when precise quantities of supplies or services, above a specified minimum, cannot be determined. Indefinite Delivery/Indefinite Quantity contracts help streamline the contract process and service delivery and allow the City the flexibility to add work as needs arise or change. As each project is defined, a specific work assignment will be assigned to the contractor who will complete the scope of work for the unit prices included in the contract. Work deadlines will be established for each work assignment.

 

The project consists of services such as repairing, restoring or strengthening of major structural elements like exposed bridge supports; preservation of stone arch bridges; channel scour remediation; replacement of rock riprap; curb and gutter, driveway and sidewalk; installation of metal beam guard fence; replacement of deteriorated bridge railing; concrete repair; railing post reconstruction; joint seals; deck treatments; milling and asphalt overlay; and striping for maintenance work on selected bridges. The project also includes complex bridge repairs, such as historic bridges, that require specialized equipment, personnel, and materials. All required permits, traffic control and environmental control measures necessary to perform the work are included in the contract.

 

The base bid was used to identify and determine the lowest responsive bidder and to determine contract unit prices for each bid item.

 

This request allows for the award and execution of a construction contract with Restek, Inc., for an estimated period of one-year with four, one-year extensions. However, if funds for the initial term are expended, staff may accelerate the extension options but in no event will exceed the total contract amount. The extension options are subject to the agreement of both parties. 

 

This program provides for repairs to multiple structures located at various locations within the city limits. A delay in the approval of this contract could compromise strategies that aim to prevent and reduce the deterioration of bridge structures throughout the city.

 

This project will be located Citywide in all Districts.

 

Restek, Inc. is located in Menchaca, Texas.

 

Strategic Outcome(s)

Strategic Outcome(s):

Safety, Mobility.